Intercontinental Hotel - O2, London

Published on 3rd May 2016

Case Study: Intercontinental Hotel, O2 - London

Project Value (£): 30m

Number of Door sets: 687

Description of involvment:

Supplying the hardware to this prestigious hotel situated next door to the iconic O2 in London.

687 door sets of hardware to the back and front of house areas with door automation that Doras Hardware both supplied and fitted.

We supplied both polished and satin stainless steel polished bespoke products, in line with their sister hotel at Terminal 5, The Softitel.

 

 

Contact Us